Other references

ACAMP s.r.o. Č. Budějovice, Czech Republic / AUSTRIA CAMPINGSPORT Ges. m.b.H, Vorchdorf, Austria

  • Reconstruction of the hall in Č.Budějovice /1996-1997, 4800 m2 of floor area/
  • Reconstruction and extension – storehouse in Č. Budějovice /2002, 1500 m2 of floor area/
  • Reconstruction and extension of the plant in Č. Budějovice /2004, 4 100 m2 of floor area/
A. Pöttinger spol. s r.o. Vodňany, Czech Republic / Alois Pöttinger Maschinenfabrik Ges. m.b.H, Grieskirchen, Austria

  • Reconstruction of the hall VOD Vodňany /1999-2000, 1000 m2 of floor area/
  • New production plant in Vodňany 1st stage – welding plant /2004-2007, 7 000 m2 of floor area/
  • New production plant in Vodňany 2nd stage – KTL plant, hardening plant /2007-2008, 6 500 m2 of floor area/
  • New production plant in Vodňany 3rd stage – metalworking plant, logistics /2008-2009, 5 650 m2 of floor area/
  • New production plant in Vodňany 4th stage – metalworking plant, logistics /2010-2011, 7 760 m2 of floor area/
  • New production plant in Vodňany 5th stage – assembly plant, logistics /2013-2015, 1 500 m2 of floor area in buildings + 18 000 m2 of paved outdoor area/
  • New production plant in Vodňany 6th stage – picking, parking extension, cloakrooms extension /2013-2016, 600 m2 of floor area in buildings + 5 000 m2 of roofed outdoor area + 15 000 m2 of paved outdoor area/
  • New production plant in Vodňany 7th stage – assembly plant, logistics /2012-2017, 12 700 m2 of floor area in buildings/
  • New production plant in Vodňany – loading ramp /2019-2021, 2 270 m2 of paved outdoor area/
APP-PROJEKT Č.Budějovice, Czech Republic

  • Superstructure and reconstruction of an office building /1996-1997, 820 m2 of floor area/
Automotive Lighting, s.r.o. Jihlava, Czech Republic / Robert Bosch GmbH, Stuttgart, Germany

  • New production plant in Jihlava – Assembly hall and storehouse for headlamp production /1998-2000, 27 000 m2 of floor area/
Automotive Lighting s.r.o. Jihlava, Czech Republic

  • Extension of the plant in Jihlava – New building – production shop with 3 storey annex /2003, 8 500 m2 of floor area/
    Lamps Surface Treatement Plant in Jihlava /2003/
  • Extension of the plant in Jihlava for headlamp production, reconstruction and extension of production shop with 3 storey annex /2005-2006, 21 500 m2 of floor area/
BBH Tsuchiya s.r.o. České Budějovice, Czech Republic / Tsuchiya Co.,Ltd, Nagoya, Japan

  • New production plant in České Budějovice – label manufacturing, print shop, production shop with office built-in /2011-2014, 7 600 m2 of floor area/
Berger Bohemia, a.s. Plzeň, Czech Republic / Berger Bau SE, Passau, Germany
Bosch Diesel spol. s.r.o. Jihlava, Czech Republic / Robert Bosch GmbH, Stuttgart, Germany

  • New production plant for CommonRail pumps – production shop with storehouse Ji 301 /2000-2001, 43 000 m2 of floor area/
  • Extension of the plant for CommonRail pumps – production shop Ji 310 /2001, 21 000 m2 of floor area/
  • Extension of the plant for CommonRail pumps – production shop Ji 350 /2004, 21 600 m2 of floor area/
  • Extension of the plant for CommonRail pumps – production shop Ji 350A /2004-2005, 20 300 m2 of floor area/
  • Extension of the production shop Jh201a in the plant II //2007-2008, 2 750 m2 of floor area/
  • Extension of the building Jh102 in the plant I /2017-2018, 880 m2 of floor area/
Bosch odbytová spol. s.r.o. Praha, Czech Republic / Robert Bosch GmbH, Stuttgart, Germany

  • New building – Power Tools Service center in Mikulov, Repair shop and storehouse Mku 101 /2006-2007, 3 000 m2 of floor area/
  • Extension of the Power Tools Service center in Mikulov /2012-2013, 5 430 m2 of floor area/
Bosch Rexroth spol. s.r.o. Brno, Czech Republic / Robert Bosch GmbH, Stuttgart, Germany

  •  New production plant for hydraulics and electric drives and controls – production shop with 2 storey annex Brn 201 /2007-2008, 8 700 m2 of floor area/
Bosch Termotechnika s.r.o. Praha, Czech Republic / Robert Bosch GmbH, Stuttgart, Germany

  • Reconstruction of the TT Sales Centre – office reconstruction and built-in offices in the storehouse /2011 – 2012, 1 370 m2 of floor area/
Czech Industrial Park s.r.o. Planá n.L, Czech Republic

  • New building Kompakt 3 – Production and warehousing hall of PETstaple fibers /2013 – 2016, 10 900 m2 of floor area/
  • New Gatehouse SILON /2018, 210 m2 of roofed outdoor area and floor area/
CZ LOKO, a. s., Česká Třebová, Czech Republic

  • New office building Česká Třebová /2018, 2000 m2 of floor area/
  • Master plan of the plant Jihlava /2018, 35 000 m2 of plant area/
  • Assembly hall Jihlava /2018-2019, 3600 m2 of floor area/
  • Master plan of the plant Česká Třebová /2019, 94 000 m2 of plant area/
ČEZ, a. s. Praha / Nuclear Power Plant Temelín, Czech Republic

  • Parking lot extension ETE /2009, 12 000 m2 of paved outdoor area/
  • Outlet pipes adjustments ETE in Kořensko /2010/
ČZ a. s., Praha, Czech Republic

  • Reconstruction of the building II in the plant Strakonice – production shop with 3 storey annex /2002-2003, 6750 m2 of floor area/
  • Extension of Aluminium foundry XXIXc in the plant Strakonice – production shop /2002-2003, 2000 m2 of floor area/
  • Conversion test room turbochargers in the hall LXXII in the plant Strakonice /2012 – 2013, 180 m2 of floor area/
  • Retrofitting of the development and testing center in the hall LXXII /2014, 72 m2 of floor area/
Elektro A-Technik, Č. Krumlov, Czech Republic
  • New building – Shopping Centre Domoradice – Český Krumlov /1997, 2 900 m2 of floor area/
Engel strojírenská spol. s r.o. Kaplice, Czech Republic / Engel Holding Gesellschaft m.b.H. Schwertberg, Austria

  • New production plant in Kaplice /2008, 21 400 m2 of floor area /
  • Parking lot extension in the plant Kaplice /2011, 3 000 m2 of paved outdoor area/
  • Extension of built-in offices in the plant Kaplice /2011 – 2013, 100 m2 of floor area/
  • Building modifications in the plant Kaplice /2019 -2020, without new floor area/
E.ON Trend s.r.o, Č.Budějovice, Czech Republic
  • Installation of a cogeneration unit at the wellneshotel in Frymburk /2013, 200 m2 of floor area/
Galí Optik spol. s r.o. Domažlice , Czech Republic / Metzler Optik Partner AG, Mühlacker, Germany

  • New production plant for manufacturing of glasses GALÍ Optik in Domažlice /1994-1997, 6 500 m2 of floor area/
  • Storehouse of waste materials and combustibles in Domažlice /1996-1997, 260 m2 of floor area/
  • Extension of the Galí Optik’s production building /1995-1996, 3 750 m2 of floor area/
Graphite Týn, spol. s r.o., Týn n. V., Czech Republic / Graphit Kropfmühl AG, Hauzenberg, Germany

  • Plant extension in Týn n.V. /2007, 1 500 m2 of floor area/
HATZ CZ spol. s r.o., Vlachovo Březí, Czech Republic /Motorenfabrik HATZ GmbH & Co.KG, Ruhstorf, Germany

  • New production plant in Vlachovo Březí 1st stage – assembly of diesel engines /1998-2000, 3500 m2 of floor area/
  • Built-in working platform in production shop 1 /2005, 450 m2 of floor area/
  • New building – Production shop 2 /2005-2006, 5000 m2 of floor area/
  • Extension of the plant in Vlachovo Březí /2014 – 2015, 11 500 m2 of floor area/
  • Reconstruction of the existing industrial area in Prachatice /2014 – 2015, 20 000 m2 of floor area/
Hettich ČR k.s., Žďár nad Sázavou, Czech Republic / Anton Hettich GmbH & Co., Dr. Erwin Hettich GmbH & Co, Kirchlengern, Germany

  • Extension of the plant Hettich in Žďár nad Sázavou 1st stage /2005-2006, 11 000 m2 of floor area/
Jihostroj a.s., Velešín, Czech Republic

  • Reconstruction of parrafine oil storage /1995, 150 m2 of floor area/
  • Reconstruction of the part of the hall M02 to degreasing room /1995-1996, 100 m2 of floor area/
  • Waste storage U1 /1996, 360 m2 of floor area/
  • Transfer of hydraulic production to the shop M6 /1997-1998, 9 500 m2 of floor area/
  • New technological installations in the shop M6 /1999-2000, 7 500 m2 of floor area/
South Bohemian University, České Budějovice, Czech Republic

  • Reconstruction of the historic five-storey building for the Faculty of Education in Dukelská Str., Č.Budějovice, /2020-2021, 6 760 m2 of floor area/
  • Reconstruction of the historic five-storey building for the Faculty of Education in Jeronýmova ul., Č.Budějovice, /2020-2021, 6 410 m2 of floor area/
  • Extension of the building for Faculty of Health and Social Studies Vltava, 4th stage, Č.Budějovice, /2020-2021, 1 050 m2 of floor area/
JVK, České Budějovice, Czech Republic
  • Renovation of the facilities in the library building /2003, 4000 m2 of floor area/
  • Elevators and wheelchair access to the library building /2003-2008/
KERN-LIEBERS CR spol. s r.o., Č.Budějovice, Czech Republic / Hugo Kern und Liebers GmbH & Co.KG, Schramberg, Germany

  • New production plant in České Budějovice /2001-2002, 12 500 m2 of floor area/
  • Expansion of the production plant in České Budějovice /2014-2018, 9 200 m2 of floor area/
KOITO MANUFACTURING CO., LTD. , Tokyo, Japan

  • Production plant KOITO in Czech Republic /2000, 12 000 m2 of floor area/
KUNC ocelové konstrukce s.r.o., Kaplice, Czech Republic
  • Production hall in Kaplice /1995-1996, 850 m2 of floor area/
LAMINEX s.r.o., Č.Budějovice, Czech Republic

  • Reconstruction of an old water power plant for paddles production /1999-2000, 850 m2 of floor area/
LAMIVEX s.r.o., Strakonice, Czech Republic

  • Master plan of the plant Strakonice //2019-2020, 30 000 m2 of floor area
City of České Budějovice, Czech Republic

  • Reconstruction of an old town house for the kindergarten in Č.Budějovice – Kněžské Dvory /2014, 820 m2 of floor area/
  • change of the city zoning plan in locality Okružní I /2020-2021, 100 000 m2 of solved area/
  • change of the city zoning plan in locality Okružní II /2020-2021, 45 000 m2 of solved area/
Motoco a. s., Č. Budějovice, Czech Republic / Tecumseh Power Company, Grafton, Wisconsin, USA

  • New building and reconstruction of production plant Č. Budějovice /2001, 7400 m2 of floor area/
  • Reconstruction of the plant Č. Budějovice /2001, 26 000 m2 of floor area /
Olredo Holding, Linz, Austria
  • Reconstruction of the office building in Č.Budějovice /1995-1996, 3 750 m2 of floor area/
Philips Mecoma Česká s.r.o., Č.Budějovice, Czech Republic

  • New production plant in Č. Budějovice /1999-2000, 12 600 m2 of floor area/
PORR, a.s., Praha, Czech Republic

  • New multifunctional building in Karlovy Vary/Karlsbad, Office building with 2 underground floors and 7 upper floors in the city center /2010-2013, 9 400 m2 of floor area/
REWE spol. s r.o., Praha, Czech Republic

  • New building – Penny Market in Č. Krumlov /1996-1997, 1000 m2 of floor area/
Robert Bosch spol. s r.o. Č. Budějovice, Czech Republic / Robert Bosch GmbH, Stuttgart, Germany

  • Reconstruction and extension of the factory in Č.Budějovice I.-III. stage
    New building Bj 080 – Production shop and the 2-storey annex building with change rooms
    New building Bj 090 – Production shop and the 3-storey annex building with offices
    Reconstruction of the building Bj 052 – Storehouse
    Reconstruction of the building Bj 053 – Storehouse
    Reconstruction of the building Bj 054 – Energy Centre
    /1992-1993, a total of 22 500 m2 of floor area/
  • New canteen Bj 092 /1994-1995, 450 m2 of floor area/
  • Reconstruction of the building Bj 064 – building for the plastic injection moulding /1994-1996, 3 600 m2 of floor area/
  • New building Bj 066 – Storage for rest stuffs /1995-1996, 500 m2 of floor area/
  • Reconstruction of the annex building Bj 080b – change rooms /1995-1996, 600 m2 of floor area/
  • Petrol tank and make-up plant for the pump test room /1995-1996/
  • Storehouse for pallets Bj 067 /1995-1997, 750 m2, of floor area/
  • Housing development Nemanice /1996-1998, 1 520 m2 of floor area/
  • Car park for employees Bj 899 /1996, 3 600 m2 of paved outdoor area/
  • Production shop Bj 080c /1996-1997, 3 900 m2 of floor area/
  • Reconstruction and extension of the building Bj 065 – Compressor test room /1996-2000, 500 m2 of floor area/
  • New canopy at the building Bj 064 /1997-1998, 500 m2 of roofed area/
  • Long-term test center Bj 063 /1997-1999, 540 m2 of floor area/
  • North access road to the plant /1998-2000, 3400 m2 of paved outdoor area/
  • Production shop Bj 100 /1998-1999, 8 500 m2 of floor area/
  • Extension of the building Bj 066b – Cooling source /1999, 400 m2 of floor area/
  • Installation of the LSF4 production in the shop Bj 090 /1999-2000/
  • Reconstruction of the building Bj 053 /1999-2000, 1000 m2 of floor area/
  • Reconstruction and extension of the canteen Bj 092 /2001, 800 m2 of floor area/
  • New canopy at the building Bj 080c /2002, 350 m2 of roofed area/
  • Extension of the office in the building Bj 090 /2003, 520 m2 of floor area/
  • Reconstruction of the shop Bj 052 /2003-2004, 2600 m2 of floor area/
  • Research and development center for fuel systems /2004-2005, 4000 m2 of floor area/
  • Sprinkler water tank Bj056 /2004-2005, 350 m2 of floor area/
  • Connecting corridors Bj 080 – Bj 090 /2004-2005/
  • Extension of production shop and logistics Bj090a /2005-2006, 9 800 m2 of floor area/
  • Extension of R&D center for fuel systems Bj055a /2006, 2200 m2 of floor area/
  • New R&D center + canteen Bj057 /2008, 5200 m2 of floor area /
  • Extension of production shop and logistics Bj090b /2010 – 2012, 9 400 m2 of floor area/
  • New canteen Bj057 /2012-2015, 2100 m2 of floor area/
  • New parking lot „North“ Bj850 /2012-2013, 11200 m2 of paved outdoor area/
  • Extension of the office in the building Bj 090 /2013 – 2014, 300 m2 of floor area/
  • Clean room in the building Bj090b 1st to 3rd stage /2011- 2015, 800 m2 of floor area/
  • Reconstruction of the production shop Bj 064 /2015 – 2018, 3 700 m2 of floor area/
  • Multi-storey car park Bj 110 /2016 – 2018, 11 500 m2 of floor area/
  • Research and development center Bj058 /2016 – 2019, 14 000 m2 of floor area/
  • Extension tool shop Bj051 /2017-2018, 300 m2 of floor area/
  • Laboratory and office building Bj 059 /2020-2021, 3 500 m2 of floor area/
SILON s.r.o., Planá nad Lužnicí, Czech Republic / Consil VBGmbH, Düsseldorf, Germany
Shimizu Corporation, Praha, Czech Republic / Shimizu Corporation, Tokyo, Japan

  • New production plant in České Budějovice – label manufacturing, print shop, Production shop with the office built-in /2011-2014, 7 600 m2 of floor area/
SWIETELSKY stavební s r.o., Czech Republic /Swietelsky Baugesellschaft m.b.H., Linz, Austria

  • Reconstruction of the area „U Hada“ – building modifications of area for construction company /2010-2011, 35 000 m2 area/
  • Construction modifications in the plant for asphalt mixtures Kájov /2020-2021, 8 000 m2 of paved outdoor area/
ŠKODA AUTO a.s., Mladá Boleslav, Czech Republic

  • Reconstruction of pipe installations /1998/
TBB Č.Budějovice nemovitosti spol. s r.o., Czech Republic / XXXLutz GmbH, Wels, Austria

  •  Furnishing house XXXLutz Praha Stodulky – reconstruction of the existing building for furniture house with restaurant and store /2009-2010, 62 000 m2 of floor area/
  • Furnishing house Möbelix Ústí nad Labem – new building for furniture house with store /2010, 11 470 m2 of floor area/
  • Furnishing house Möbelix Opava, new building for furniture house with store /2019-2021, 10 300 m2 of floor area/
  • Furnishing house Möbelix Smart Jindřichův Hradec, new building for furniture house with store /2021, 2 100 m2 of floor area/
Umdasch Shop-Concept spol. s r.o. Č.Budějovice, Czech Republic / Umdasch Shop-Concept GmbH, Amstetten, Austria

Willi Betz Bohemia spol. s r. o. Bor, Czech Republic / Internationale Spedition Willi Betz GmbH & Co. KG, Reutlingen, Germany

  • Reconstruction of the storehouse Č. Budějovice- Sprinkler /1997-1998, 4 000 m2 of floor area/
  • Reconstruction of storehouse in Č. Budějovice /1998-2000, 4000 m2 of floor area/
  • Extension of the storehouse in Č. Budějovice /1999-2000, 4000 m2 of floor area/

32 years of experience

Since 1992 we have been providing you with comprehensive services in design and engineering of buildings. We are long-term and stable partner for our clients, including some major and reputable companies. Please look at our references.